Introduction and overview
The new generation Cashpower Gemini PLC
meter is a compact, single-phase, keypad based, 80 Amp split
prepayment meter in a BS 5685 standard housing. Communication
between the meter and the customer interface unit is by
means of Power Line Carrier technology. (PLC) |
| Split Metering Functionality
The split prepayment meter consists of
two parts, the meter and the customer interface unit. Communication
between the meter and the customer interface unit is by
means of Power Line Communication (PLC), using existing
household wiring; - no additional communication wires are
required.
The customer interface unit is a compact
unit with a user-friendly keypad and display. It may be
installed in
any convenient location in the consumer’s home where
there is an electrical socket outlet. The prepayment meter
contains all critical metering, number decryption and load
control functionality. It operates independently and is
immune to any form of tampering on the customer interface
unit.
The meter is usually installed in a secure,
locked enclosure, typically a pavement kiosk or pole-mounted
equivalent. It is outside the consumer’s home to facilitate
easy inspection by the utility at any time and to reduce
the opportunity of fraud by tampering. |
Features
- 80 Amp split PLC prepayment meter
- Compact prepayment meter design,
with British Standard layout
- Power Line Carrier communication
between meter and the customer interface unit
- Power Line Carrier communication
from concentrator in a kiosk or substation to the
meter for remote access.
- Optical port for alternative communication
to kiosk
concentrator.
- Quick and easy to install - uses
existing household
wiring, ideal when additional communication wire is
not convenient.
- Proven Cashpower keypad technology
- Tamper detection
- Significant Reverse Energy (SRE)
detection
- Programmable software power limit
- Advanced commissioning feature
- Prepayment or credit metering modes
of operation
- STS Compliant
- Language independent user interface
- Optional display on the meter for
field technicians
- Diagnostic LED’s on the meter
- Backlighting on customer interface
display, audible and visual low credit alarm,
- High surge withstand capability
for areas prone to lightning or other line surges
- SABS 1524 and IEC 62052-11, IEC
62053-21 compliant
|
Principle of operation
A key feature of the Cashpower Gemini PLC
split prepayment meter is the ability to use standard household
wiring for communication between the customer interface
unit and the prepayment meter. This capability enhances
retrofitting or replacement of conventional meters with
prepayment meters in apartment blocks and housing estates.
The benefits include lower cost of installation,
as no new cabling needs to be laid, and speed of installation.
The keypad or customer interface unit is simply plugged
into any existing mains outlet and, after a simple commissioning
procedure, the unit communicates with the remote meter up
to a distance of typically 200 m. The maximum communication
distance is dependent upon network attenuation and interference.
|
User-friendly customer
interface
The customer interface is connected by
a power cord to an existing mains outlet in the household.
Under normal conditions, when there is sufficient credit
in the meter, the customer interface unit operates directly
from mains voltage. However in the event that the meter
credit expires and the meter disconnects power to the house,
the customer interface unit is fitted with two standard
AA Alkaline batteries to allow the customer to re-enter
a new credit voucher.
The customer interface has a large backlit
display with configurable functionality. The customer or
field technician can access meter parameters by entering
specific register information using the keypad. In addition,
the customer interface unit has audible low credit warning
tones that can be silenced with a key press.
|
Meter status and diagnostic
indicators
Meter status and diagnostic indicator The
meter includes a LED status indicator. This allows a technician
to view the operational status of the meter without the
need for specialised interrogation tools or having to gain
access to the consumer’s premises. Information such
as tamper status, power limiting, commissioned status and
credit status are available.
|
Optional LCD display
on the meter
While the standard split PLC prepayment
meter does not necessitate a display, an optional Cashpower
Gemini PLC meter model is available with a large clear display
to enable field staff to read the meter parameters in a
secure kiosk. This meter can be configured at the time of
manufacture to show total kilowatt-hours consumed to date
as a running total while consumers are able to see the remaining
kilowatthours or units of electricity remaining, on the
customer interface unit display in their house.
|
Interrogation port
More detailed information and programming
is achieved via the standard interrogation port at the rear
of the
meter. This is an optional model on request.
|
Optical interface
The SSP PLC meter has an IEC 62056-21 compliant
optical communications port. This allows the utility to
access a variety of information stored inside the meter
using an optical pick-up.
|
Tamper detection
The split configuration of Gemini PLC meters
significantly reduces the risk of tampering, especially
considering that the meter is installed in a remote, secure
location. The meter is also mechanically sealed against
tampering through the use of a factory-sealed screw plugs
on the rear of the meter, and a utilitysealed wire seal
on the front of the meter. The use of these mechanical seals
ensures that there are visible signs of tampering if unauthorised
entry is attempted. In addition, the meter is equipped with
a tamper sensor that will automatically disconnect the power
to the load in the event of tampering.
The meter also has a feature allowing detection
of Significant Reverse Energy. If the line and load wires
are swapped during installation, the meter will continue
to operate and decrement credit but can be factory programmed
to tamper and disconnect the load should Significant Reverse
Energy be detected. Another anti-tamper feature comprises
an interlocking mechanical design whereby two halves of
the meter cannot be opened until the terminal cover of the
meter has been removed. To do so, a utility seal has to
be broken.
|
| Remote Access
The meter is capable of “upstream”
communication to a concentrator at a kiosk, low-voltage
distribution transformer or mini sub-station. This feature
enables the new generation Gemini PLC meter to be remotely
accessed by the utility to check the remaining kilowatt-hours,
if the meter has been tampered, total kilowatt-hours used
to date, maximum power limit and other useful parameters
stored by the prepayment meter.
Communications capability can be implemented
in two ways. A concentrator, supplied by Landis+Gyr or a
third party, can be fitted into the secure enclosure to
provide connectivity via wireless technology to a power
utility’s back office. As with all Cashpower split
prepayment meters, the Gemini PLC has an optical communications
port and each meter in the enclosure is connected to the
concentrator via an optical port reading device. By means
of the concentrator and the optical communication port,
bi-directional communication is possible. A message can
be sent to each meter to request information and prepayment
vouchers (purchased by a specific consumer or generated
for maintenance purposes) could be sent in a virtual payment
process.
|
Prepayment / Credit
feature
Using supplier-specific 20 digit STS prepayment
vouchers which are unique to each meter, the Cashpower Gemini
PLC prepayment meter can be converted into a standard credit
meter, while retaining some of the useful features of a
prepayment meter. These include the anti tamper facility,
maximum power limit and remote customer interface unit for
customer convenience. The meter can be switched between
credit mode and prepayment mode when necessary, using a
20 digit STS prepayment voucher generated by
Landis+Gyr’s Suprima prepayment system.
|
Surge protection
The meter incorporates comprehensive, 30kA
lightning surge protection that exceeds the requirements
of IEC
62052-11.
|
| (click
for more info - SSP PLC Specifications - "allow
time for page to load" ) |